Language

24 Cavities Hot Runner Needle Valve Preform Mould

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2018-06-02 10:06

  • Browse the number:

    395

Send an inquiries
Company Profile
Taizhou Huangyan YUNO Mould Factory
By certification [File Integrity]
Contact:

yuannengmosu(Mr.)  

Email:

Telephone:

Phone:

Area:

Beijing

Address:

No.5. Hongsi Yanchang, East City, Huangyan, Taizhou, Zhejiang, China

Website:

http://www.petmouldfactory.com/ http://yuannengmosu.sjsytzsh.com/

Product Details
24 Cavities Hot Runner Needle Valve Preform Mould

Mould Description:24 Cavities PET preform mould with hot runner.
Shape: Round shape
Cavity quantity:24 cavities
Main mould base :P20 steel (Nitrogen treatment, HRC 28-32 degree)
Core (punch) and cavity:S136  (Vacuum quench treatment, HRC 43-52 degree)
Screw neck (lip):S136
Heating plate: H13 steel , Chinese standard manifold.
Heating ring: ROTFIL from Italy.
Temperature controller: PID voltage temperature controller
Preform mould configuration Adopted European mould structure: PET materials go into nozzle tip straightly to improve mould cycle time.
Cooling system on cavity, core. If u require, we also design the cooling system on neck (slip).
Preforms drop through injection machine central ejector automatically
The controller heat Individual cavities, runner and sprue.
One Temperature zone control one point temperature.
Double-locked, inter-changeable mould components;
Usage life (guarantee):3,000,000 shots-5,000,000 shots
Country of origin: China
Warranty Period:one year
Delivery time:30-45 days
Shipping Port:FOB Ningbo FOB Shanghai
MOQ: 1 set pet preform mould
Package: packed in wooden cases
Payment T/T: 30%deposite, 70% balance after approval of all types of samples but before delivery.
Mould features: 1)No cutting of valve gate is employed to reduce the labor cost 2)advanced hot runner system assures lower level of AA value  3)Reasonable-designed cold water channels increase cooling effect and shorten the cycle time.


http://www.petmouldfactory.com/